Product details
The split set rock bolt roll forming machine adopts thickened welded steel frame with overall stress relief annealing, high structural rigidity to eliminate running vibration, adapting long uninterrupted industrial production for mining bolt manufacturing.
Equipped with mature PLC touch screen control system, all forming speed, cutting length and production quantity can be digitally set, intuitive operation interface cuts worker training cycle greatly.
Forming rollers are made of high-quality alloy steel via precision turning, quenching and hard chrome plating, high surface hardness and outstanding wear resistance to guarantee uniform bolt outer diameter and smooth finished surface.
Mainly processes round seamless steel pipe and galvanized steel tube for split set anchor bolt, widely used in coal mine, tunnel excavation, slope stabilization and underground engineering support industry.
Built-in automatic hydraulic fixed-length cutting unit realizes clean cutting without notch deformation, effectively improving finished rock bolt yield and reducing material waste during mass production.
Frequency conversion speed regulation structure supports stepless speed adjustment, flexible switching between small batch trial production and large-volume continuous processing to match varied customer order demands.
Optimized compact layout saves workshop land occupation; standardized transmission assembly facilitates daily lubrication, inspection and quick replacement of wearing spare parts to cut maintenance cost.
Low-noise energy-saving driving system complies with modern industrial environmental standards, lowering long-term power consumption and improving on-site working environment for operators.
Key electric components adopt well-known brand accessories, stable operational performance and low breakdown rate, avoiding unexpected shutdown losses for rock bolt processing factories.



-
Step 1
Payment and order readiness
Minimum order: 1 Units
Payment terms, specifications, and order details are confirmed before preparation begins.
-
Step 2
Preparation
45 days
-
Step 3
Packaging and dispatch
Air + Express via FLY Logistics · Approx. shipping fee: $ 4.00 for 1 set · Transit time: Est. 8-9 days
Final packing, freight, and delivery dates are confirmed before dispatch.
Customer reviews
No reviews yet
Be the first customer to review this product.
Write a review
Request custom sourcing
Can’t find what you’re looking for? Share the requirement and our sourcing team will find the right industrial product.